ENERSIGN
Project inquiry

Home / Projects / Extended factory

Extended factory.

Conversion · Stuttgart, Germany

Architect: g2o Architekten

Between 2015 and 2017 the former factory building was given an energy retrofit and an additional story. The result is 475 m² of living space and 130 m² of offices. The existing brick structure received mineral wool insulation; the addition is a timber-frame construction with cellulose insulation.

The windows had to work in two kinds of construction: in the insulated masonry of the old building and in the new timber structure above it. In the studios the old brickwork was left exposed on some walls, while the rooms of the addition sit beneath a timber ceiling. The building meets the KfW Efficiency House 40 standard and, by calculation, the Passive House standard.

Key facts

ItemDetail
Architectg2o Architekten
Building typeFormer factory building from 1930, renovated and extended upward; housing and offices
Products installedPassive House windows
Energy standardKfW Efficiency House 40 (Passive House standard by calculation)
Year2017

Photographs

Extended factory, Courtyard side with escape stair
Courtyard side with escape stair
Extended factory, Studio with old brickwork
Studio with old brickwork
Extended factory, Roofscape
Roofscape
Extended factory, Room under the timber ceiling
Room under the timber ceiling

Products used

More projects

Show us your design.

The earlier we join the design process, the slimmer the details become.